Dhading [Nepal], April 15 (ANI): Nepal’s first-ever transport tunnel, the Nagdhunga-Sisneri Tunnel, being built with Japanese aid, witnessed a breakthrough on Monday.
Nepali Prime Minister Pushpa Kamal Dahal switched on the electric control for the controlled explosion for the breakthrough of the tunnel, bringing down the 2 metre portion, marking it as a breakthrough and the end of the digging process.
The tunnel, coverin
Home News Item Nepal’s first transport tunnel being built with Japanese loan witnesses major breakthrough

Nepal’s first transport tunnel being built with Japanese loan witnesses major breakthrough
april 15, 2024by Reacties uitgeschakeld voor Nepal’s first transport tunnel being built with Japanese loan witnesses major breakthrough
Previous Post
"What you have done in the last ten years": Pawan Khera asks BJP
Next Post
CPI (M) wants to make India "powerless": Biplab Deb on party's promise to eliminate nuclear weapons